12/01/2007
Work resumes!!!
But lots of clean up to do first.
The driveway (1,100ft.) was re-graded and the ditches redefined. Lumber is being re-stacked and inventoried.
A pile of dirt was in the way so it got used as the back-fill dirt against the house.
Gary is testing the trap door being installed on the front deck for "special" visitors.
Also, a big pile of trash left on the ground from the last builder had to be picked up and put in the dumpster.
(Just kidding, it wasn't actually this big but it seemed like it was)