3/06/2008

Shingles

The roofer is on day 2 of the shingle job.  2 more days should do it.

 

 

     

 

Installing the bath tub.

     

 

Heating / AC duct work is beginning.

 

Porch railings are all on now.

     

 

 

This is the office doorway.

You can see the pocket door frames on installed.

 

Framing is now complete.

  

 

Time Out

Updates to this web page will be slow coming from this point on.

I'm taking on the Electrical, plumbing and drywall work myself so the builders

will be taking some time off the project till these things are done.

Then they'll be back to finish up.