2/12/09
Finishing the Trim
Below is the laundry pass-through door that Dave made.
It goes from the Master Bedroom closet to the linen closet out in the hall.
Next is the salvaged antique corner sink that my folks brought back from there Las Vegas vacation.
The Master Bedroom walk-in closet gets a stucco ceiling.
The Office pocket doors open to the balcony.
Finished Doors.
| Pantry door | From inside the Master Bedroom |
The small louvered closet door on the balcony |
| Pantry door (open) | Inside the pantry (they even installed the food!) | Dave working on the bedroom door. |
| The Master Bedroom door (outside) | Inside the 2nd floor West bedroom. | From inside the 2nd floor West bedroom |
| On the balcony hallway. | Twin closets in the 2nd floor East bedroom.
|
In the basement looking up.
|
| Balcony
|
Balcony
|
The finished Laundry Closet door.
| The Laundry Closet doors are almost done.
|
Unfinished Laundry closet door.
(Still need louvers installed in the bottom)
|
Other Stuff.
That's all for this update.